Service visit on Sammaltunturi station

February 27, 2021

A maintenance trip was made to the Sammaltunturi station in February 2021. The ice load-weighing instrument OLWI was removed for maintenance, the ICEMET-sensor was replaced with a new one due to tail wing heating issue and a heatable power line cable was installed as an icing test target. A timelapse video from the service visit found below.